Please rotate your device

Blue Valley School District

Campus Office Building - Landscape

Campus Office Building - Landscape

Information

  • Location Overland Park, Kansas
  • Services Landscape

This office building is located on the administrative campus of a suburban school district. In compliance with the Campus Master Plan, the building was sited to maximize green space for future development and minimize the impact on this fairly undisturbed site. The design incorporated existing trees to the maximum extent possible, both conserving the natural elements of the site and providing shade along the south side of the new building. In keeping with early sustainable design goals, the design team designed a five-cell stormwater infiltration system collecting all of the site runoff from the building roof, parking and surrounding site. Each cell has 3-feet of bioretention soil and is planted with indigenous plants that naturally absorb the harvested rainwater, further restoring the native setting. This system therefore eliminated the stormwater runoff that otherwise would have been introduced to the existing storm sewer system (which was already at capacity), and avoided a very expensive connection to the City’s infrastructure.

Make My Volume

Make My Volume helps you curate your own downloadable PDF Volume of our projects and people.
Click on the icon on projects and people pages to add to your Volume.
Need help or have feedback? Please contact us at .

Making your volume

Send a link of your Volume to yourself:

    Please check this box if you would like BNIM to contact you.

    There was an issue with your submission. If the problem persists, please contact us.

    Your Volume has been sent.

    View volume

    Volumes are emailed immediately.
    Please check your spam folder if you don't see the email in your inbox.